Skip to content
Page 44 of 52
Geomacro

Global Risk Intelligence Infrastructure

geomacro.livecontact@geomacro.livePublic DocumentationSeptember 2026
DocumentationPage 44 of 52

43. Determinism

GRI v1.2 is deterministic after event classification and current-contract story assignment.

The numeric aggregation itself contains no LLM call and no discretionary manual adjustment.

With the same validated inputs, as-of time and methodology version, the aggregate should reproduce the same result within the documented numeric contract.

Deterministic artifacts include or can include:

  • methodology manifest/hash
  • input and evidence hashes
  • effective evidence weights
  • category contributions
  • raw and display score
  • change attribution
  • calculation/proof hashes

Risk Objects also canonicalize their signable payload before hashing and Ed25519 signing.

Model-produced classification or interpretation must not silently rewrite an already published deterministic snapshot. Material methodology changes require a new version.

© 2026 Geomacro · geomacro.live · contact@geomacro.livePage 44 of 52