Global Risk Intelligence Infrastructure
DocumentationPage 38 of 52
37. Research and Experimental Layers
Geomacro uses explicit public status labels so implemented capability is not confused with roadmap intent.
The website-wide status vocabulary is:
- LIVE — available in the current public product
- PRIVATE PILOT — implemented but access and validation are controlled
- TECHNICAL PROOF — working secondary/Testnet implementation, not a primary production service
- PLANNED — intended or under development, not currently available
- LEGACY — older implementation retained for compatibility or evidence
Examples:
| Capability | Status |
|---|---|
| Public Risk Intelligence | LIVE |
| Geopolitical Risk Index | LIVE |
| Macroeconomic Risk Index | LIVE |
| Critical Minerals Risk Index | LIVE |
| Ask Geomacro | LIVE |
| Risk API / Risk Gate | PRIVATE PILOT |
| Prediction markets | TECHNICAL PROOF |
| Arc / CCTP / Bridge & Swap | TECHNICAL PROOF |
| Broad professional/enterprise packaging | PLANNED |
The current public Risk Indices preserve the versioned GRI v1.2 parent methodology and verified proof lineage. Historical combined-GRI snapshots remain versioned audit records rather than a second current headline product.
A roadmap item or experimental implementation must never be presented as generally available solely because code exists.
